
In the game “Fantasy Life 1: The Girl Who Steals Time”, you’ll find a vast array of over 300 armor options, ensuring that you and your party members are well-equipped. This game offers nine different categories of armor. While you can buy armor from Armories or Marco’s Shop, crafting your own gear is recommended for better defense, magic defense, and potential unique skills.
Guide will be updated and adjusted as progress is made in-game. Will include late-game spoilers.
Every Armor in Fantasy Life i
Where to Find All Armor
Every time I embark on a new life journey, I gain access to unique armor tailored for that phase of my existence. Reaching Adept level in any life grants me a brand-new set of armor. As I advance further to Master rank, I’ll be rewarded with exceptional armor or clothing. Additionally, as I progress, I will unlock crafting recipes to create custom gear inspired by various aspects of my lives.
In the game “Fantasy Life I”, there are nine different types of armor, which means you can potentially wear 8 to 9 pieces in each character. Here’s how to unlock their crafting recipes:
1. Light Armor – Crafted with basic materials found early on in the game.
2. Medium Armor – Requires a higher level and more advanced materials for crafting.
3. Heavy Armor – Crafted using rare materials and is available at the highest levels of the game.
4. Helmets – Protects your head and can be found in various categories.
5. Chestpieces – Covers your torso and comes in different styles for each category.
6. Gloves – Protects your hands and offers unique abilities depending on the armor type.
7. Boots – Protects your feet and also provides movement bonuses.
8. Belts – Enhances your character’s stats and can be found in all categories.
9. Capes – Offers additional passive skills and is available only in certain categories.
- Head
- Cape
- Body/Dress
- Hands
- Legs
- Feet
- Accessories
- Specs
- Shield
Head

Gear placed in the Head section of your inventory equipment. This includes various headpieces like hats and helmets, but also unique items such as cat ears or hair decorations.
At your Base Camp, you might find an armor piece hidden within the debris. To clear the debris, you’ll need the assistance of Strangelings, which you can transform back to their original state at the Goddess Statue.
| Head | |
|---|---|
| Name | How to Get |
| Explorer’s Hat | Default |
| Archeologist’s Hat | Purchase the Digital Deluxe Edition |
| Trip’s Helmet | Purchase the Digital Deluxe Edition |
| Paladin’s Helm | Paladin Fledgling rank |
| Mercenary’s Headwrap | Mercenary Fledgling rank |
| Hunter’s Headdress | Hunter Fledgling rank |
| Magician’s Headwrap | Magician Fledgling rank |
| Miner’s Helmet | Miner Fledgling rank |
| Woodcutter’s Cap | Woodcutter Fledgling rank |
| Angler’s Hat | Angler Fledgling rank |
| Farmer’s Hat | Farmer Fledgling rank |
| Cook’s Hat | Cook Fledgling rank |
| Blacksmith’s Bandana | Blacksmith Fledgling rank |
| Tailor’s Cap | Tailor Fledgling rank |
| Artist’s Beret | Artist Fledgling rank |
| White Cat Ears | Marco’s Shop (Fruit Exchange) |
| Black Cat Ears | Traveling Merchant in Ginormosia |
| Desert Headwear | Traveling Merchant in Ginormosia |
| Bronze Helm | Armor Shop in the Capital |
| Merchant’s Headwrap | Armory in Eternia Village |
| Green Highland Beret | Armory on Faraway Island |
| Gale Hood | Armory on Faraway Island |
| Tunoco Hat | Armory on Tropica Isles |
| Pirate Bandana | Armory on Tropica Isles |
| Folk Dancer’s Flower | Armory on Tropica Isles |
| Aqua Hood | Armory on Swolean Island |
| Blue Tunoco Cap | Armory on Swolean Island |
| Shaman’s Headdress | Armory on Swolean Island |
| Magic Dress | Marco’s Shop |
| Magic Hat | Marco’s Shop |
| Blue Magic Hat | Marco’s Shop |
| Highland Beret | Marco’s Shop |
| White Tunoco Hat | Marco’s Shop |
| Sailor’s Hat | Marco’s Shop |
| Carrottella Head | Marco’s Shop |
| Dancer’s Veil | Tailor Adept rank |
| Coastal Headwear | Tailor Apprentice rank |
| Gold Helm | Blacksmith Expert Rank |
| Tidal Helm | Blacksmith Expert Rank |
| Leather Cap | Blacksmith Fledgling rank |
| Iron Helm | Blacksmith Apprentice rank |
| Snakeskin Helm | Blacksmith Apprentice rank |
| Rugged Cap | Blacksmith Adept rank |
| Merfolk Helm | Blacksmith Adept rank |
| Beastly Cap | Mercenary Adept rank |
| Arcane Helm | Blacksmith Master rank |
| Pegasus Helm | Blacksmith Master rank |
| Hunter’s Hood | Tailor Fledgling rank |
| Royal Maker’s Cap | Tailor Master rank |
| Mage’s Hood | Haniwa Hamlet |
| Paladin’s Helm | Paladin Fledgling rank |
| Templar’s Helm | Paladin Master rank |
| Legionary Helmet | Paladin Adept rank |
| Beast Cap | Mercenary Adept rank |
| Battleborn Helm | Mercenary Master rank |
| Marksman’s Headdress | Hunter Adept rank |
| Falconer’s Hat | Hunter Master rank |
| Conjurer’s Hood | Magician Adept rank |
| Sorcerer’s Hat | Magician Master rank |
| Excavators Helmet | Miner Adept rank |
| Grand Minder’s Helmet | Miner Master rank |
| Lush Hat | Woodcutter Adept rank |
| Forester’s Cap | Woodcutter Master rank |
| Big Catch Cap | Angler Adept rank |
| Mariner’s Cap | Angler Master rank |
| Planter’s Hat | Farmer Adept rank |
| Pumpkin Hat | Farmer Master rank |
| Sous Chef’s Hat | Cook Adept rank |
| Master Chef’s Hat | Cook Master rank |
| Ancient Mech Helm | Blacksmith Adept rank |
| Forgemaster’s Helm | Blacksmith Master rank |
| Sawyer’s Helmet | Carpenter Adept rank |
| Foreman’s Bandana | Carpenter Master rank |
| Fluffy Hat | Tailor Adept rank |
| Couturier’s Cap | Tailor Master rank |
| Researcher’s Hat | Alchemist Adept rank |
| Artificer’s Hat | Alchemist Master rank |
| Palette Beret | Artist Adept rank |
| Old Master’s Beret | Artist Master rank |
| Forager King Helm | Arena reward |
| Artisan King Bandana | Arena reward |
| Apocalypse Helm | Mysterious Slate exchange reward (postgame) |
| Steel Beast’s Helm | Mysterious Slate exchange reward (postgame) |
| Dark Beast’s Hat | Mysterious Slate exchange reward (postgame) |
| Swabbie’s Hat | Leafe reward |
| Red Pirate Bandana | Traveling Merchant in Ginormosia |
| Blue Pirate Bandana | Traveling Merchant in Ginormosia |
| Flame Hood | Tailor Adept rank |
| Earth Hood | Tailor Expert rank |
| Blue Highland Beret | Tailor Expert rank |
| Spelunker Headwear | Tailor Expert rank |
| Angelic Hat | Tailor Master rank |
| Radiant Hood | Tailor Master rank |
| Umbral Hood | Tailor Master rank |
| Inferno Helm | Fort Gardhart |
Cape
Cape armor also includes backpacks, wings, and scarves.
| Cape | |
|---|---|
| Name | How to Get |
| Explorer’s Backpack | Default |
| Cape | Armor Shop in the Capital |
| White Cape | Armory on Faraway Island |
| Short Cape | Armory in Eternia Village |
| Short Green Cape | Simian Settlement |
| Short Yellow Cape | Marco’s Shop |
| Long Cape | Haniwa Hamlet |
| Long Sky Blue Cape | Traveling Merchant in Ginormosia |
| Long Pink Cape | Marco’s Shop |
| Dark Beast’s Scarf | Mysterious Slate exchange reward (postgame) |
| Dragon Wings | Marco’s Shop (Fruit Exchange) |
| Demon Wings | Mysterious Slate exchange reward (postgame) |
| Apocalypse Wings | Mysterious Slate exchange reward (postgame) |
| Angelic Wings | Traveling Merchant in Ginormosia |
| Mercenary’s Scarf | Mercenary Fledgling rank |
| Falconer’s Cloak | Hunter Master rank |
| Conjurer’s Cloak | Magician Adept rank |
| Excavator’s Scarf | Miner Adept rank |
| Mariner’s Scarf | Angler Master rank |
| Artificer’s Goggles | Alchemist Master rank |
| Steel Beast’s Wings | Mysterious Slate exchange reward (postgame) |
| Forager King Cape | Arena reward |
| Merchant’s Backpack | Armory in Eternia Village |
| Legionary Cape | Paladin Adept rank |
| Divine Wings | Mysterious Slate exchange reward (postgame) |
| Pegasus Cape | Tailor Master rank |
| Royal Cape | Tailor Master rank |
| Templar’s Cape | Reach Master Rank for Paladin Life |
| Battleborn Cape | Mercenary Master rank |
| Gale Robe | Armory on Faraway Island |
| Sea Cape | Armory on Tropica Isles |
Body/Dress
In simpler terms, some body armors are multi-functional, serving as both clothing for the upper body (dress) and lower body (legs). If you put on armor in the ‘Legs’ category, it will replace any dress armor you currently have equipped.
| Body/Dress | |
|---|---|
| Name | How to Get |
| Explorer’s Clothes | Default |
| Ethereal Girl’s Dress | Purchase the Digital Deluxe Edition |
| Archeologist’s Coat | Purchase the Digital Deluxe Edition |
| Paladin’s Cuirass | Paladin Fledgling rank |
| Mercenary’s Top | Mercenary Fledgling rank |
| Hunter’s Vest | Hunter Fledgling rank |
| Magician’s Robe | Magician Fledgling rank |
| Miner’s Clothes | Miner Fledgling rank |
| Angler’s Vest | Angler Fledgling rank |
| Woodcutter’s Clothes | Woodcutter Fledgling rank |
| Cook’s Apron | Cook Fledgling rank |
| Blacksmith’s Apron | Blacksmith Fledgling rank |
| Tailor’s Top | Tailor Fledgling rank |
| Carpenter’s Top | Carpenter Fledgling rank |
| Alchemist’s Lab Coat | Alchemist Fledglink rank |
| Artist’s Top | Artist Fledgling rank |
| Wanderer’s Jerkin | Armor Shop in the Capital |
| Bronze Breastplate | Armor Shop in the Capital |
| Merchant’s Vest | Armory in Eternia Village |
| Green Highland Top | Armory on Faraway Island |
| Folk Dancer’s Top | Armory on Tropica Isles |
| Tunoco Jerkin | Armory on Tropica Isles |
| Shaman’s Top | Armory on Swolean Island |
| Blue Tunoco Jerkin | Armory on Swolean Island |
| Aqua Robe | Armory on Swolean Island |
| Highland Top | Marco’s Shop |
| Sailor’s Top | Marco’s Shop |
| White Tunoco Jerkin | Marco’s Shop |
| Carrotella Costume | Marco’s Shop |
| Leather Jerkin | Blacksmith Fledgling rank |
| Iron Cuirass | Blacksmith Apprentice rank |
| Rugged Jerkin | Blacksmith Adept rank |
| Merfolk Mail | Blacksmith Adept rank |
| Gold Cuirass | Blacksmith Expert rank |
| Beastly Jerkin | Mercenary Adept rank |
| Tidal Cuirass | Blacksmith Expert rank |
| Arcane Cuirass | Blacksmith Master rank |
| Hunter’s Bolero | Tailor Fledgling rank |
| Coastal Brigandine | Tailor Apprentice rank |
| Blue Highland Top | Tailor Expert rank |
| Spelunker Brigandine | Tailor Expert rank |
| Royal Maker’s Top | Tailor Master rank |
| Desert Brigandine | Traveling Merchant in Ginormosia |
| Traditional Vest | Armory on Faraway Island |
| Cozy Brigandine | Treasure Grove |
| Salamander Mail | Panther Preserve |
| Inferno Cuirass | Fort Gardhart |
| Holy Cuirass | Blacksmith Master rank |
| Templar’s Cuirass | Paladin Master rank |
| Battleborn Cuirass | Mercenary Master rank |
| Marksman’s Vest | Hunter Adept rank |
| Falconer’s Tunic | Hunter Master rank |
| Big Catch Vest | Angler Adept rank |
| Mariner’s Vest | Angler Master rank |
| Sawyer’s Outfit | Carpenter Adept rank |
| Swabbie’s Top | Leafe reward |
| Chic Sailor’s Top | Tailor Fledgling rank |
| Pegasus Plate Armor | Blacksmith Master rank |
| Divine Plate Armor | Mysterious Slate exchange reward (postgame) |
| Dancer’s Garb | Tailor Adept rank |
| Flame Robe | Tailor Adept rank |
| Earth Robe | Tailor Expert rank |
| Radiant Robe | Tailor Master rank |
| Umbral Robe | Tailor Master rank |
| Angelic Dress | Tailor Master rank |
| Royal Tunic | Tailor Master rank |
| Blue Magic Dress | Marco’s Shop |
| Pink Magic Dress | Traveling Merchant in Ginormosia |
| Legionary Armor | Paladin Adept rank |
| Beast Clothes | Mercenary Adept rank |
| Magician’s Robe | Magician Fledgling rank |
| Conjurer’s Robe | Magician Adept rank |
| Sorcerer’s Robe | Magician Master rank |
| Excavator’s Clothes | Miner Adept rank |
| Grand Miner’s Outfit | Miner Master rank |
| Lush Clothes | Woodcutter Adept rank |
| Farmer’s Clothes | Farmer Fledgling rank |
| Forester’s Coat | Woodcutter Master rank |
| Planter’s Clothes | Farmer Adept rank |
| Pumpkin Overalls | Farmer Master rank |
| Sous Chef’s Outfit | Cook Adept rank |
| Master Chef’s Outfit | Cook Master rank |
| Ancient Mech Apron | Blacksmith Adept rank |
| Forgemaster’s Outfit | Blacksmith Master rank |
| Foreman’s Outfit | Carpenter Master rank |
| Fluffy Clothes | Tailor Adept rank |
| Couturier’s Clothes | Tailor Master rank |
| Researcher’s Clothes | Alchemist Adept rank |
| Artificer’s Coat | Alchemist Master rank |
| Palette Clothes | Artist Adept rank |
| Old Master’s Apron | Artist Master rank |
| Forager King Vest | Arena reward |
| Artisan King Smock | Arena reward |
| Apocalypse Armor | Mysterious Slate exchange reward (postgame) |
| Steel Beast’s Outfit | Mysterious Slate exchange reward (postgame) |
| Dark Beast’s Outfit | Mysterious Slate exchange reward (postgame) |
| Chic Sailor’s Hat | Tailor Fledgling rank |
| Black Magic Dress | Mysterious Slate exchange reward (postgame) |
Hands
The Hands armor category includes gauntlets, gloves, and even bangles.
| Hands | |
|---|---|
| Name | How to Get |
| Leather Gauntlets | Blacksmith Fledgling rank |
| Iron Gauntlets | Blacksmith Apprentice rank |
| Snakeskin Gloves | Blacksmith Apprentice rank |
| Rugged Gauntlets | Blacksmith Adept rank |
| Merfolk Gloves | Blacksmith Adept rank |
| Gold Gauntlets | Blacksmith Expert rank |
| Beastly Gauntlets | Mercenary Adept rank |
| Wanderer’s Gauntlets | Armor Shop in the Capital |
| Bronze Gauntlets | Armor Shop in the Capital |
| Merchant’s Bangles | Armory in Eternia Village |
| Folk Dancer’s Bangle | Armory on Tropica Isles |
| Tunoco Gloves | Armory on Tropica Isles |
| Shaman’s Bangles | Armory on Swolean Island |
| Blue Tunoco Gloves | Armory on Swolean Island |
| White Tunoco Gloves | Marco’s Shop |
| Carrotella Hands | Marco’s Shop |
| Tidal Gauntlets | Blacksmith Expert rank |
| Arcane Gauntlets | Blacksmith Master rank |
| Pegasus Gauntlets | Blacksmith Master rank |
| Divine Gauntlets | Mysterious Slate exchange reward (postgame) |
| Coastal Gloves | Tailor Apprentice rank |
| Dancer’s Bangles | Tailor Adept rank |
| Spelunker Gloves | Tailor Expert rank |
| Royal Maker’s Gloves | Tailor Master rank |
| Royal Bangles | Tailor Master rank |
| Cozy Gloves | Treasure Grove |
| Salamander Gloves | Panther Preserve |
| Inferno Gauntlets | Fort Gardhart |
| Holy Gauntlets | Blacksmith Master rank |
| Templar’s Gauntlets | Paladin Master rank |
| Mercenary’s Gloves | Mercenary Fledgling rank |
| Beast Gloves | Mercenary Adept rank |
| Battleborn Gloves | Mercenary Master rank |
| Hunter’s Glove | Hunter Fledgling rank |
| Marksman’s Glove | Hunter Adept rank |
| Falconer’s Gloves | Hunter Master rank |
| Conjurer’s Gloves | Magician Adept rank |
| Excavator’s Gloves | Miner Adept rank |
| Grand Miner’s Gloves | Miner Master rank |
| Woodcutter’s Gloves | Woodcutter Fledgling rank |
| Lush Gloves | Woodcutter Adept rank |
| Forester’s Gloves | Woodcutter Master rank |
| Big Catch Gloves | Angler Adept rank |
| Mariner’s Gloves | Angler Master rank |
| Planter’s Gloves | Farmer Adept rank |
| Pumpkin Gloves | Farmer Master rank |
| Cook’s Mittens | Cook Fledgling rank |
| Sous Chef’s Mittens | Cook Adept rank |
| Blacksmith’s Gloves | Blacksmith Fledgling rank |
| Ancient Mech Gloves | Blacksmith Adept rank |
| Forgemaster’s Gloves | Blacksmith Master rank |
| Carpenter’s Gloves | Carpenter Fledgling rank |
| Sawyer’s Gloves | Carpenter Adept rank |
| Foreman’s Gloves | Carpenter Master rank |
| Couturier’s Pincushion | Tailor Master rank |
| Artist’s Glove | Artist Fledgling rank |
| Palette Glove | Artist Adept rank |
| Old Master’s Glove | Artist Master rank |
| Researcher’s Glove | Alchemist Adept rank |
| Forager King Bangles | Arena reward |
| Artistan King Bangles | Arena reward |
| Apocalypse Gauntlets | Mysterious Slate exchange reward (postgame) |
| Steel Beast’s Gloves | Mysterious Slate exchange reward (postgame) |
| Dark Beast’s Gloves | Mysterious Slate exchange reward (postgame) |
Legs
In simpler terms, leg protection could either be pants-like (leggings) or shin-to-knee plate armor (greaves), but they can’t be worn with dress armor. Depending on the method used to create them, you might need assistance from a Blacksmith or Tailor for crafting.
| Legs | |
|---|---|
| Name | How to Get |
| Cozy Bottoms | Treasure Grove |
| Leather Leggings | Blacksmith Fledgling rank |
| Bronze Leggings | Armor Shop in the Capital |
| Iron Greaves | Blacksmith Apprentice rank |
| Gold Greaves | Blacksmith Expert rank |
| Arcane Greaves | Blacksmith Master rank |
| Snakeskin Leggings | Blacksmith Apprentice rank |
| Rugged Leggings | Blacksmith Adept rank |
| Coastal Bottoms | Tailor Apprentice rank |
| Merfolk Leggings | Blacksmith Adept rank |
| Tidal Leggings | Blacksmith Expert rank |
| Beastly Leggings | Mercenary Adept rank |
| Mercenary’s Trunks | Mercenary Fledgling rank |
| Hunter’s Trunks | Hunter Fledgling rank |
| Hunter’s Pants | Tailor Fledgling rank |
| Angler’s Trunks | Angler Fledgling rank |
| Mariner’s Pants | Angler Master rank |
| Carpenter’s Pants | Carpenter Fledgling rank |
| Tailor’s Smock | Tailor Fledgling rank |
| Artist’s Apron | Artist Fledgling rank |
| Marksman’s Pants | Hunter Adept rank |
| Big Catch Pants | Angler Adept rank |
| Falconer’s Pants | Hunter Master rank |
| Sailor’s Pants | Marco’s Shop |
| Swabbie’s Pants | Leafe reward |
| Chic Sailor’s Pants | Tailor Fledgling rank |
| Highland Kilt | Marco’s Shop |
| Blue Highland Kilt | Tailor Expert rank |
| Green Highland Kilt | Armory on Faraway Island |
| Merchant’s Apron | Armory in Eternia Village |
| Desert Bottoms | Traveling Merchant in Ginormosia |
| Spelunker Bottoms | Tailor Expert rank |
| Wanderer’s Greaves | Get crafting recipe from the Armor Shop in the Capital. |
| Royal Maker’s Apron | Tailor Master rank |
| Inferno Leggings | Fort Gardhart |
| Holy Leggings | Blacksmith Master rank |
| Salamander Leggings | Panther Preserve |
| Battleborn Leggings | Mercenary Master rank |
| Templar’s Plate Legs | Paladin Master rank |
| Traditional Sarong | Armory on Faraway Island |
| Folk Dancer’s Sarong | Armory on Tropica Isles |
| Shaman’s Sarong | Armory on Swolean Island |
| Tunoco Pants | Armory on Tropica Isles |
| White Tunoco Pants | Marco’s Shop |
| Blue Tunoco Pants | Armory on Swolean Island |
Feet
| Feet | |
|---|---|
| Name | How to Get |
| Explorer’s Shoes | Default |
| Leather Boots | Blacksmith Fledgling rank |
| Iron Boots | Blacksmith Apprentice rank |
| Snakeskin Boots | Blacksmith Apprentice rank |
| Rugged Boots | Blacksmith Adept rank |
| Merfolk Boots | Blacksmith Adept rank |
| Gold Boots | Blacksmith Expert rank |
| Bronze Boots | Armor Shop in the Capital |
| Wanderer’s Boots | Armor Shop in the Capital |
| Tunoco Boots | Armory on Tropica Isles |
| Blue Tunoco Boots | Armory on Swolean Island |
| Magic Boots | Marco’s Shop |
| Blue Magic Boots | Marco’s Shop |
| Highland Loafers | Marco’s Shop |
| Sailor’s Boots | Marco’s Shop |
| White Tunoco Boots | Marco’s Shop |
| Carrotella Clogs | Marco’s Shop |
| Beastly Boots | Mercenary Adept rank |
| Tidal Boots | Blacksmith Expert rank |
| Arcane Boots | Blacksmith Master rank |
| Pegasus Boots | Blacksmith Master rank |
| Divine Boots | Mysterious Slate exchange reward (postgame) |
| Hunter’s Shoes | Tailor Fledgling rank |
| Coastal Boots | Tailor Apprentice rank |
| Dancer’s Shoes | Tailor Adept rank |
| Spelunker Boots | Tailor Expert rank |
| Royal Maker’s Shoes | Tailor Master rank |
| Angelic Sandals | Tailor Master rank |
| Royal Sandals | Tailor Master rank |
| Desert Boots | Traveling Merchant in Ginormosia |
| Pink Magic Boots | Traveling Merchant in Ginormosia |
| Cozy Boots | Treasure Grove |
| Salamander Boots | Panther Preserve |
| Inferno Boots | Fort Gardhart |
| Holy Boots | Blacksmith Master rank |
| Paladin’s Sandals | Paladin Fledgling rank |
| Legionary Sandals | Paladin Adept rank |
| Mercenary’s Sandals | Mercenary Fledglink rank |
| Templar’s Boots | Paladin Master rank |
| Beast Sandals | Mercenary Adept rank |
| Battleborn Boots | Mercenary Master rank |
| Hunter’s Sandals | Hunter Fledgling rank |
| Magician’s Shoes | Magician Fledgling rank |
| Marksman’s Sandals | Hunter Adept rank |
| Falconer’s boots | Hunter Master rank |
| Conjurer’s Shoes | Magician Adept rank |
| Sorcerer’s Shoes | Magician Master rank |
| Miner’s Shoes | Miner Fledgling rank |
| Excavator’s Boots | Miner Adept rank |
| Grand Miner’s Boots | Miner Master rank |
| Woodcutter’s Shoes | Woodcutter Fledgling rank |
| Lush Shoes | Woodcutter Adept rank |
| Forester’s Boots | Woodcutter Master rank |
| Angler’s Sandals | Angler Fledgling rank |
| Big Catch Sandals | Angler Adept rank |
| Mariner’s Sandals | Angler Master rank |
| Farmer’s Boots | Farmer Fledgling rank |
| Planter’s Shoes | Farmer Adept rank |
| Pumpkin Shoes | Farmer Master rank |
| Cook’s Shoes | Cook Fledgling rank |
| Sous Chef’s Shoes | Cook Adept rank |
| Master Chef’s Shoes | Cook Master rank |
| Blacksmith’s Shoes | Blacksmith Fledgling rank |
| Ancient Mech Boots | Blacksmith Adept rank |
| Forgemaster’s Boots | Blacksmith Master rank |
| Carpenter’s Sandals | Carpenter Fledgling rank |
| Sawyer’s Sandals | Carpenter Adept rank |
| Foreman’s Boots | Carpenter Master rank |
| Tailor’s Sandals | Tailor Fledgling rank |
| Fluffy Shoes | Tailor Adept rank |
| Couturier’s Loafers | Tailor Master rank |
| Alchemist’s Shoes | Alchemist Fledgling rank |
| Researcher’s Shoes | Alchemist Adept rank |
| Artificer’s Shoes | Alchemist Master rank |
| Artist’s Sandals | Artist Fledgling rank |
| Palette Sandals | Artist Adept rank |
| Old Master’s Sandals | Artist Master rank |
| Forager King Sandals | Arena reward |
| Artisan King Shoes | Arena reward |
| Black Magic Boots | Mysterious Slate exchange reward (postgame) |
| Apocalypse Boots | Mysterious Slate exchange reward (postgame) |
| Steel Beast’s Boots | Mysterious Slate exchange reward (postgame) |
| Dark Beast’s Boots | Mysterious Slate exchange reward (postgame) |
| Chic Sailor’s Boots | Tailor Fledgling rank |
| Swabbie’s Boots | Leafe reward |
| Ethereal Girl’s Sandals | Purchase the Digital Deluxe Edition |
| Archeologist’s Boots | Purchase the Digital Deluxe Edition |
Accessories
Accessories and Specifications are items that function like armor, often granting special abilities such as increasing experience points by 5%. These items are created using Alchemy. The majority of them can be obtained by advancing your Alchemist rank, but you may also find crafting recipes in armories throughout Reveria.
In this version, I’ve tried to make the text more conversational and easier to read by breaking it down into smaller sentences and using more everyday language. Additionally, I’ve added a bit of clarity by explicitly stating that Accessories and Specifications function like armor and grant special abilities.
| Accessories | |
|---|---|
| Name | How to Get |
| Flutter Charm | New Adventure’s Pack |
| Edward’s Fob Watch | Marco’s Shop (Fruit Exchange) |
| Skelegon Talisman | Marco’s Shop (Fruit Exchange) |
| Topaz Ring | Alchemist Fledgling rank |
| Charm | Alchemist Fledgling rank |
| Coral Necklace | Alchemist Fledgling rank |
| Durable Charm | Armory on Swolean Island |
| Aquamarine Ring | Alchemist Apprentice rank |
| Ruby Ring | Alchemist Expert rank |
| Amethyst Ring | Alchemist Adept rank |
| Sapphire Ring | Alchemist Expert rank |
| Emerald Ring | Alchemist Expert rank |
| Diamond Ring | Alchemist Master rank |
| Black Onyx Ring | Alchemist Master rank |
| Blossom Corsage | Alchemist Master rank |
| Reinforced Charm | Alchemist Apprentice rank |
| Claw Necklace | Alchemist Apprentice rank |
| Rugged Necklace | Alchemist Adept rank |
| Marine Necklace | Alchemist Adept rank |
| Beastly Necklace | Alchemist Expert rank |
| Sea Necklace | Alchemist Master rank |
| Umbral Choker | Alchemist Master rank |
| Cog Brooch | Alchemist Expert rank |
| Hagram Strap | Marco’s Shop (Fruit Exchange) |
| Trip Earrings | Marco’s Shop (Fruit Exchange) |
| Paladin’s Pride | Paladin Heroic rank |
| Mercenary’s Pride | Mercenary Heroic rank |
| Hunter’s Pride | Hunter Heroic rank |
| Magician’s Pride | Magician Heroic rank |
| Miner’s Pride | Miner Heroic rank |
| Woodcutter’s Pride | Woodcutter Heroic rank |
| Angler’s Pride | Angler Heroic rank |
| Cook’s Pride | Cook Heroic rank |
| Blacksmith’s Pride | Blacksmith Heroic rank |
| Carpenter’s Pride | Carpenter Heroic rank |
| Tailor’s Pride | Tailor Heroic rank |
| Alchemist’s Pride | Alchemist Heroic rank |
| Farmer’s Pride | Farmer Heroic rank |
| Artist’s Pride | Artist Heroic rank |
Specs
| Specs | |
|---|---|
| Name | How to Get |
| Alchemist’s Monocle | Alchemist Fledgling rank |
| Adorable Eyepatch | Traveling Merchant in Ginormosia |
| Sunglasses | Alchemist Apprentice rank |
| Silver Round Specs | Alchemist Adept rank |
| Black Round Specs | Marco’s Shop (Fruit Exchange) |
| Gold Round Specs | Alchemist Expert rank |
| Protective Goggles | Alchemist Expert rank |
| Swirly Specs | Alchemist Master rank |
| Mini Specs | Armory on Faraway Island |
| Blue-Rimmed Glasses | Leafe reward |
| Red-Rimmed Glasses | Marco’s Shop |
| Green-Rimmed Glasses | Alchemist Fledgling rank |
| Black-Rimmed Glasses | Alchemist Adept rank |
Shield
Shields serve as unique armor exclusively for characters with the Paladin Life. Characters possessing the Paladin Life, as well as their allies, are capable of wielding these shields. It’s beneficial to select a shield with favorable statistics and abilities, as it can effectively ward off enemy attacks during battle.
Remember, shields don’t completely prevent damage; they can reduce it, but you might still sustain a single point of damage from a weaker adversary when defending with your shield.
| Shield | |
|---|---|
| Name | How to Get |
| Bronze Shield | Blacksmith Fledgling rank |
| Paladin’s Shield | Blacksmith Fledgling rank |
| Iron Shield | Blacksmith Apprentice rank |
| Silver Shield | Blacksmith Adept rank |
| Blossom Buckler | Blacksmith Adept rank |
| Gold Shield | Blacksmith Expert rank |
| Captain’s Shield | Blacksmith Expert rank |
| Red Dragon Shield | Blacksmith Expert rank |
| Knight’s Oath | Blacksmith Expert rank |
| Pomme Protector | Blacksmith Expert rank |
| Shield of Time | Blacksmith Expert rank |
| Abyssal Guardian | Blacksmith Heroic rank |
| Apocalypse Shield | Mysterious Slate exchange reward (postgame) |
| Azure Wing Shield | Blacksmith Heroic rank |
| Arcanite Shield | Blacksmith Heroic rank |
| True Shield of Time | West Greatgut Plains, northwest of Fort Gardhart |
Read More
- All Shadow Armor Locations in Crimson Desert
- How to Get the Sunset Reed Armor Set and Hollow Visage Sword in Crimson Desert
- Best Bows in Crimson Desert
- Jujutsu Kaisen Season 3 Episode 12 Release Date
- All Golden Greed Armor Locations in Crimson Desert
- Wings of Iron Walkthrough in Crimson Desert
- How to Craft the Elegant Carmine Armor in Crimson Desert
- All Helfryn Armor Locations in Crimson Desert
- How To Beat Ator Archon of Antumbra In Crimson Desert
- Dark Marksman Armor Locations in Crimson Desert
2025-06-07 23:33